BBS News

BBS Engineers: Boiler Projects

Regardless of the boiler type or fuel utilized, our Engineering Group has a long history of designing and overseeing new boiler and boiler system replacement projects, including various conversions from one type fuel to another. Since the beginning of keeping such records in 1991, we have designed and implemented over (200) major boiler system renovations, upgrades, replacements, conversions, and emergency projects; not counting new boiler system installations. The most recent of these Engineering assignments are:

2021
Huntington UFSD – Finley MS Boiler Replacement
Valley Stream CHSD – South HS Emergency Boilerfeed System Replacement
North Babylon UFSD – North Babylon HS Boilers
Catskill CSD – Catskill MS Boilers
Deer Park Public Library – Boiler / HVAC System Replacement

2020
Huntington UFSD – Huntington HS Boilers
Oyster Bay-East Norwich CSD – Oyster Bay HS (East Wing) Boilers Conversion to Gas
Oyster Bay-East Norwich CSD – Oyster Bay HS Other Boilers
Merrick UFSD – Levy/lakeside ES Emergency Boilerfeed/Vacuum System Replacement

2019
Scarsdale UFSD – High School Boilers
Huntington UFSD – Woodhull IS Boilers
Good Shepherd RC Church – Boiler Replacement
Our Lady of the Snow RC Church Boiler Upgrade
St. Joseph’s RC Church Boiler Replacement
Corpus Christi RC Parish – Church Building + Parish School Boiler Replacements

2018
North Babylon UFSD – Marion G. Vedder ES Boilers
Huntington UFSD – Jack Abrams STEM School Boilers
Plainview-Old Bethpage CSD – John F. Kennedy HS Boilers
Plainview-Old Bethpage CSD – Jamaica Ave. ES Boilers
Plainview-Old Bethpage CSD – Pasadena ES Boilers
Plainview-Old Bethpage CSD – Stratford Rd. ES Boilers
Plainview-Old Bethpage CSD – Old Bethpage ES Boilers

2017
Northport-East Northport UFSD – Ocean Ave. ES Boilers
Northport-East Northport UFSD – Pulaski Rd. ES Boilers
North Babylon UFSD – Woods Rd. ES Boilers
Great Neck UFSD – Parkville School Annex Boiler Upgrades

2016
Northport-East Northport UFSD – Northport HS Boilers
Northport-East Northport UFSD – Norwood Ave. ES Boilers
Great Neck UFSD – Grace Ave. Building Boiler Upgrades
Valley Stream CHSD – Central HS + North HS Boilers
North Shore CSD – Sea Cliff ES Boilers
Quogue UFSD – District-wide Boilers, Temperature Controls

2015
Herricks UFSD – Herricks MS Boiler Replacement
Plainview-Old Bethpage CSD – Mattlin MS Boiler Replacement
Great Neck UFSD – Great Neck HS Boilers
Eastern Suffolk BOCES – Ward Tech Center, Bldg. #1, #4
Eastern Suffolk BOCES – Westhampton Beach Learning Center, Bldg. #1

Back to News Feed